-
Worried, only 4 months left 2010
With only a bit over 4 months left in 2010 and they can't even give us a release date on the next update other than a vague "Fall" ...?
What gives?
Just curious what you all think? Seem like October is out of the question at this point?
-
Re: Worried, only 4 months left 2010
Sept. 14th.
Beta is done, for all intents and purposes. Yet another stress test tonight, beta 4 launched Monday, with a whole three reported additions/fixes/ect in the patch notes. With a few un-reported fixes/additions/ect that didn't make the patch notes.
I'm just saying, with the NDA down focused feedback basically done and the patches getting smaller and smaller with beta phases getting shorter and shorter, with "Wont make it in for launch" now being spoke of more and more, with the pressure to launch, I'm thinking September.
Sept 13/14th is my guess that will probably be wrong but not by much. :D
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
birdone
With only a bit over 4 months left in 2010 and they can't even give us a release date on the next update other than a vague "Fall" ...?
There's a difference between "can't" and "haven't'". ;)
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Sapience
There's a difference between "can't" and "haven't'". ;)
Those aren't the two words that needed to be defined more clearly a long time ago.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Sapience
There's a difference between "can't" and "haven't'". ;)
Semantics... Oh wait... :p
-
Re: Worried, only 4 months left 2010
The store is still loaded with issues... I would greatly prefer to see the implementation later rather than sooner if it helps get these issues resolved.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
lordjimdudkiewicz
Those aren't the two words that needed to be defined more clearly a long time ago.
Did you mean "soon" and "soonerish"? Here ya go:
http://forums.lotro.com/showthread.php?t=343616
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
PriscillaHutchins
I could be wrong, but I'm guessing LordJim is referring to "convenience" and "advantage". ;)
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Eugorr
I could be wrong, but I'm guessing LordJim is referring to "convenience" and "advantage". ;)
Or "cake" and "pie."
-
Re: Worried, only 4 months left 2010
Last I checked Sept 14 was still in Summer...
Fall this year starts Sept 22.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Dotlbeme
Last I checked Sept 14 was still in Summer...
Fall this year starts Sept 22.
There are also other reasons that would make Sept 22nd a good day for a launch.
-
Re: Worried, only 4 months left 2010
More importantly there's only 135 shopping days left till christmas....
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Thalifea
More importantly there's only 135 shopping days left till christmas....
148 if you go by the Julian Calendar.
just sayin' :P
Quote:
Originally Posted by
Dotlbeme
Last I checked Sept 14 was still in Summer...
Fall this year starts Sept 22.
Next year too, I think. :p
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Linwe-Elfmaiden
The store is still loaded with issues... I would greatly prefer to see the implementation later rather than sooner if it helps get these issues resolved.
Generally what will happen is that it will be released and then there will be a patch very shortly thereafter to clean up any major issues. That's basically what happened with Moria...it was released with tons of bugs and they patched it like two weeks after it came out or something like that. Moria was NO where near ready for release when they released it...IMHO, anyway.
I was, however, quite surprised that they lifted the NDA so early into this beta. I am guessing that's because so much information had been leaked out already. In the past they generally lifted the NDA just a week or two before release, if that.
But, that being said, I am going to go with Grampaz on this one and say early September, if not sooner.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Dotlbeme
Last I checked Sept 14 was still in Summer...
Fall this year starts Sept 22.
Please dont launh it in sept. 22, is my wifes birthday and I wont be able to play a lot :(...
I wont complaint about a single thing the rest of the year if you choose spet 22 as the only day the update cant be launch :)
-
Re: Worried, only 4 months left 2010
here is a good date,..
http://dauntlessmedia.net/wp-content...er-300x224.jpg
:p
Who is going! LETS DO THIS!
-
Re: Worried, only 4 months left 2010
It's either "Fall" "Fallerish" or "More Fallerish (tm)'
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Elderban
Generally what will happen is that it will be released and then there will be a patch very shortly thereafter to clean up any major issues. That's basically what happened with Moria...it was released with tons of bugs and they patched it like two weeks after it came out or something like that. Moria was NO where near ready for release when they released it...IMHO, anyway.
I was, however, quite surprised that they lifted the NDA so early into this beta. I am guessing that's because so much information had been leaked out already. In the past they generally lifted the NDA just a week or two before release, if that.
But, that being said, I am going to go with Grampaz on this one and say early September, if not sooner.
Bugged is the industry standard for all game launches and has become acceptable to most. But oh, the crying that will ensue on that day!
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
zavxav
Please dont launh it in sept. 22, is my wifes birthday and I wont be able to play a lot :(...
I wont complaint about a single thing the rest of the year if you choose spet 22 as the only day the update cant be launch :)
Look at it this way - you can be patching / updating on the 22nd, take your wife out for the GREATEST birthday ever, get major brownie points, and then spend Sept 23rd playing games all day with no repercussions...unless you are still celebrating from the night before :eek:
There's something to be said about letting the massive crush of issues on Day 1 pass...
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Blue_Horseshoe
148 if you go by the Julian Calendar.
just sayin' :P
Next year too, I think. :p
Why don't we make it appropriate and say(assuming my math is correct) there are 130 shopping days left till Yule.....by Shire Reckoning
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Grampsaz
Sept. 14th.
Beta is done, for all intents and purposes. Yet another stress test tonight, beta 4 launched Monday, with a whole three reported additions/fixes/ect in the patch notes. With a few un-reported fixes/additions/ect that didn't make the patch notes.
I'm just saying, with the NDA down focused feedback basically done and the patches getting smaller and smaller with beta phases getting shorter and shorter, with "Wont make it in for launch" now being spoke of more and more, with the pressure to launch, I'm thinking September.
Sept 13/14th is my guess that will probably be wrong but not by much. :D
The date(s) you quote are not Fall but Summer. First day of Fall in the northern hemisphere is Sep 21st.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Fruinjuice
Look at it this way - you can be patching / updating on the 22nd, take your wife out for the GREATEST birthday ever, get major brownie points, and then spend Sept 23rd playing games all day with no repercussions...unless you are still celebrating from the night before :eek:
There's something to be said about letting the massive crush of issues on Day 1 pass...
Yeah is true, but I am in Nimrodel, so we dont have that much trouble cause there isnt thaty much peple as Lanroval or Brandiwyne, and all my friends will be ahead of me, including my brother :(...
I will have a backup plan is the update comes sept 22, but I am very grateful for the iea :)
-
Re: Worried, only 4 months left 2010
With account downgrade bugs, store bugs, item stats adjustments needed, and many other issues that still need to be fixed I highly doubt F2P will launch any time soon unless Turbine chooses money over quality, and releases it with lots of issues.
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
Patrickwg
With account downgrade bugs, store bugs, item stats adjustments needed, and many other issues that still need to be fixed I highly doubt F2P will launch any time soon unless Turbine chooses money over quality, and releases it with lots of issues.
That settles it. Tomorrow it is! *hide*
-
Re: Worried, only 4 months left 2010
Quote:
Originally Posted by
zavxav
I will have a backup plan is the update comes sept 22, but I am very grateful for the iea :)
Can't be Sept 22. That's Bilbo and Frodo's birthday. Can't possibly bring the servers down on that day!